Case Study

Vaccine Manufacturing Building Expansion

Vaccine Manufacturing Building Expansion

Performed EPCM services for the core and shell of a three story, 38,000 s.f. addition to Merck’s existing building 12. The design included a structural steel walk able ceiling level that allowed install of all MEP services & utilities while fit out of the process rooms was occurring below. Performed Construction management for the fit out of the new addition including modification to the existing building locker rooms and warehousing ar

Join for free to read