Case Study
Utilization Analysis of Work Devices
USE CASE Utilization Analysis of Work Devices AT A GLANCE • server-based data exchange for task distribution • capture workload and status of equipment • analysis reports based on historical dataPROBLEM DEFINITION Modern production processes are largely auto- mated from order entry through processing to manufacturing. However, a purely sequen- tial work structure is often used and the emp- loyees wait for the completion of a single pro- cess, which in turn represents an inefficient use of manpower. If activities are processed one af- ter the other, waiting times occur. This results in higher labour costs and reduced competiti- veness. SOLUTION The use of a geobased Logic Engine solution in- creases the efficiency of operational processes and ensures optimum utilization of all avai