Case Study

US/Canada Bridge

US/Canada Bridge

Case History H8005 US/Canada Bridge Fueling station for trucks and cars Over 3,000 feet of 2”, 4,000 feet of 3” and 1,000 feet of 4” Red Thread ® IIA pipe In 2008, construction was completed on the duty-free shop at a bridge that goes from Detroit, Michigan to Windsor, Canada. This shopping area has three large fueling facilities for both trucks and cars. In an effort to save money and maximize the flow of the gasoline and/or diesel fuel, the

Join for free to read