Case Study

U.S. Interstate 40

U.S. Interstate 40

Pages 2 Pages

CASESTUDY REINFORCED ASPHALT OVERLAY GG18 Site Conditions: Originally built in 1962, the segment’s 10-in. thick concrete surface had been repeatedly overlaid, while truck traffic had increased significantly in the area. The combination of an aging road, multiple repairs and continuous heavy trafficking had resulted in serious rutting conditions. Alternative Solutions: “The project started out as a mill-and-overlay job with some full reconstructio

Join for free to read