Case Study
US Highway 98, Mobile Alabama - USA
The slope was re and Platipus Anchors were installed by Bridge Creek -graded 7000 / Plati-Drains ® Construction,acertifiedPlatipusinstaller toadepthof20’withaworkingloadof4,000lbsandaproofload , of 6,000 lbs. The surface of the slope was then covered with a permanent UV stabilized eogrid and re- g vegetated. The Solution provided the opportunity for the ngineer to Anchored Reinforced Grid (ARGS E ® ) modelthefailureanddeterminethenecessaryanchorcapacityandspacing.Inprocessloadtestingverified thedesignthroughtheentireprocess.Thesitewasthenabletobevegetatedandputbacktoanaesthetically pleasingenvironmental soundstate. ly TheAlabamaDept.ofTransportation’sGeotechnicalEngineeringunitstaskedTTLInctoperformatemporary shallow plane failure repair while engineering a permanent embankment stability s