Case Study
Urgent Operational Requirement
The requirement Introduction of an air- conditioning system to the Heavy Equipment Transporter (HET) vehicles used by the British Army. Meeting the challenge In 2006, the British Army identi?ed an urgent need to add a cab air-conditioning system to a number of HET vehicles. This was necessary to cool electronic counter-measures equipment installed in the cab as well as contributing to the ef?ciency of the crew working in a tropical theatre. It is