Case Study
Uranium City
The bridge to Uranium abutment was sliding to the south and the deck required complete replacement. Ground access to Highway 962 is limited and very expensive, as there are no permanent roads linking the highway with the rest of Canada. Ice roads are available during winter, or materials may be hauled via barge in the early summer. A number of replacement options were considered for the bridge. A conventional girder-on-abutment bridge