Upgrading the Under Floor Electrical Distribution for the Banking SectorAntac was instructed by our client to install new Electrac throughout the ground fl oor, replacing all of the existing socket outlets in the fl oor boxes which were obsolete RCD sockets that we’re causing intermittent disruption to the offi ce power supply. The Challenge Our customer needed a fl exible electrical distribution system, which could be adapted to accommodate future changes to the offi ce layout. The building is equipped with a UPS system, but this had not previously supplied power to the individual fl oor boxes for the ground fl oor, so there was a risk of damage to IT hardware, loss of and corrupted data in the event of a power-cut or mains voltage fl uctuations. The offi ce space w