Case Study
Upgraded weighbridge system brings advantages in the Orkney Islands
Upgraded weighbridge system brings advantages in the Orkney Islands Weightron Bilanciai Ltd have carried out a major overhaul and system upgrade on a Shering weighbridge at the Bossack Waste Transfer and Landfill Facility near Kirkwall, in the Orkney Islands. The project has involved the replacement of the existing load cells on the 12 metre, 30 ton capacity weighbridge, together with the installation of Weightron’s card-operated driver operated terminal and D520 high visibility remote display in place of the existing instrumentation. Time was of the essence when the upgrade was carried out to ensure there was minimum operational disruption at the site. The complete project, including weights and measures reverification of the new installation, was carried out by Weightron’s engineers in