Case Study

Upfront Flow Assurance and Chemical Surveillance Engineering Lowered Ultradeepwater Production Costs

Upfront Flow Assurance and Chemical Surveillance Engineering Lowered Ultradeepwater Production Costs

Pages 2 Pages

Bene? ts ? Significant cost savings and lower overall risk ? Prevented umbilical plugging risk ? Improved electrical submersible pump (ESP) and separator efficiency Project background and challenges ? Gulf of Mexico (GoM) ultradeepwater ? Water depth to more than 8,000 feet ? 100,000 barrels of oil per day design capacity ? Subsea separation and boosting Baker Hughes solution and results ? Implemented Baker Petrolite topside process

Join for free to read