Case Study

University Technical College 2, Sheffield

University Technical College 2, Sheffield

Pages 2 Pages

KEY FACTS CASE STUDY UNIVERSITY TECHNICAL COLLEGE 2, SHEFFIELD HEADLINES BIM 14m the scheme in conjunction with client requirements from the college to ensure the best working environment was created time saving by G&H Fabrication building the plant room skid off-site met to ensure the college was operational for the new academic year Project title: University Technical College 2 Location: Sheffield Services: Mechanical and Electrical design and build Value: £2.5 million Client: The Sheffield College and Sheffield Hallam University Contractor: Bam Construction Duration: 22 weeks G&H divisions: Building Services & Fabrication led M&E scheme coordinated with the main contractor’s BIM work high atrium saw us use specialist lightweight ductw

Join for free to read