Case Study
University of Ghent, Belgium - High-Voltage Transformer Room Install
The Building: The University of Ghent consists of many buildings all of different ages, some of these buildings house high-voltage transformers which are controlled and monitored by the technical staff at the University. Some of the newer buildings have sealed material but many of the older buildings s ll have open, but secured, cabinets. The Challenge: Every room has one or more fire detectors which need to be tested at least once a year. Organising access is not always easy - for safety reasons a minimum of two people are required which takes up a lot of me and money. A solu on was sought which would offer an easier, risk free method of func onally tes ng these detectors. As these were high-voltage rooms any installa on work carried out needed to be fast, clean and easy. The Uni