Case Study
University of Connecticut Compost Facility
University of Connecticut Compost Facility | ClearSpan Challenge – Durable, covered compost facilty Solution – Hercules Truss Arch Building Size – 83' wide x 120' long Application – Compost building ClearSpan Fabric Structures is the proud manufacturer of the University of Connecticut’s newly completed 83’W x 120’L composting facility. UConn is known for its continual effort to enhance its facilities and further its students’ education with the latest technology and most up-to-date environmental regulations. According to UConn’s Office of Environmental Policy, the facility and location was “sited by a Compost Facility Site Advisory Committee which considered hydrography, aquifer protection, the slope of the land and population density in the siting process.” The facility, at maximu