Case Study
University Hospital
Our Appointment 3Sixty’s Pm was working in the capacity of a locally based Design Manager for Ellerbe Becket Inc. who were also the Design Consultants based in the USA. We had developed the project through Concept, Schematic Design and Design Development stages however Construction Documentation was organized in extensive coordination with the local Architect of Record GHD. The Benefit 3SixtyConsult’s contribution was design and project m