Case Study
Unity Point Proctor
UNITY POINT PROCTOR CASE STUDY Impact* 9,527 Trees 41,810 Gallons 78.2 Cars or or * Project impact calculated using the EPA Greenhouse Gas Equivalencies Calculator QUICK GLIMPSE Customer Unity Point Proctor Hospital Measures Implemented Install a Webster burner with parallel positioning controls and oxygen trim (O 2 trim) Total Project Cost $122,424.00 Estimated annual energy savings 70,080 Therms Estimated annual cost savings $43,286.66 ActOnEnergy incentives received $61,212.00 Estimated Payback 1.22 years BASELINE Established in the 1950’s, Unity Point Proctor is a 220- bed hospital. The 535,335 square foot hospital was partially served by a Kewanee boiler with a Gordon Piatt burner. Gordon Piatt burners are no longer manufactured and it is becoming