Case Study
Unique Polymer Systems Products For Plant & Equipment Building & Structures
Recent applica+ons carried out on a LNG carrier for Shell. Total area for repair was over 1754m2. Applica+on was required to seal in the old material and to improve the cosme+c appearance of the lagging system. The applica+on is exposed to reduced temperatures and remains wet most of the +me.