Unipart Group HSS Electric Cell Area

Unipart Group HSS Electric Cell Area

Case Study: Resin Flooring Unipart Group HSS Electric Cell Area Client: Unipart Group and HSS Project: Industrial Refurbishment Commenced: October 2016 Completed: October 2016 Area Coverage: 1650 m 2 Project Description Unipart House in Cowley, Oxfordshire had experienced many problems with resin floor coverings in the past due to the fact that the majority of their substrate is made from asphalt. As asphalt expands and contracts in different temperatures, so it presents problems for resin flooring, often causing the bonded floor covering to crack and ultimately de-bond. Zenith Pola Flooring was requested by Unipart to recommend a system that would work on asphalt for their HSS Electric Cell Area, ensuring a durable, cost-effective solution. Given the difficulties with the subs