Case Study

Underwater Pile Driving

Underwater Pile Driving

Harbour Motorway Rail Basement Sustainable Foundation Specialist Work > E.On Huntingdon field - NORTH SEA (2011) UNDERWATER PILE DRIVING Eon Ruhrgas intend to develop the Huntington field as a tie-back to a new FPSO Sevan Voyageur. The Huntington field is located in a water depth of -90m in Block 22/14b of the UK sector of the Central North Sea. The base case is for six wells (four production two water injection) to be drilled from a single drilling template located approximately 2Km south of the FPSO. The four producing wells will be tied-in to a production manifold, which in turn, will be tied back to the FPSO by a 10” production flowline, a 4” gas lift flowline and a 6” control/chemical injection umbilical. An 8” water injection flowline will connect the water in

Join for free to read