Case Study

TYLI was the design partner for the design-build delivery of three jet fuel storage tanks and a containment dike at Miami International Airport

TYLI was the design partner for the design-build delivery of three jet fuel storage tanks and a containment dike at Miami International Airport

Project Highlights: T. Y . Lin International was the design partner for the design-build delivery of three 95,600 barrel (120’ diameter by 48’ high) jet fuel storage tanks and a concrete containment dike at Miami International Airport. The services provided by the firm included preliminary and final design, as well construction administration services throughout the construction of the tanks. Jet Fuel Storage Tanks Secondary Containment Fire Alarm and Fire Protection System Environmental Remediation The site required extensive remediation for removal of contaminated soil and old underground tanks before the site work could begin. A concrete containment dike was designed and constructed to contain 110% of the volume of the largest tank. A drainage system for the containment dike was provide

Join for free to read