T.Y. Lin International Group–4th Bridge over the Panama Canal

T.Y. Lin International Group–4th Bridge over the Panama Canal

T. Y . Lin International Group | Projects | 4th Bridge over the Panama Canal T. Y . Lin International (TYLI) is serving as the Owner’s Engineer to the Republic of Panama Ministry of Public Works (MOP) for the new 4th Bridge over the Panama Canal. The firm is providing specialized technical assistance during the RFP , design, construction, and commissioning phases, ensuring the implementation of the objectives of the MOP . Featuring two dramatic towers with multiple cable planes, the signature crossing will consist of 1,010 meters of cable-stayed main bridge, a 510-meter- long by 51-meter-wide main span across the canal, and 1,500 meters of approaches. The center span will provide a 75-meter free vertical and 350-meter- wide clearance over the navigational channel to accommodate vessels for