Case Study
Two Rotoshear screens replace 14 static screens
Problem Fourteen static screens installed in a wastewater treatment plant in Monroe, NC, were unable to keep up with the heavy solids load. The major problems were screen blinding and solids that were recirculated rather than discharged from the system. The influent itself was extremely greasy, and to further complicate the process, excess polymer from the plant’s centrifugal dewatering system was making its way back to the headworks, causin