Case Study

Two Identical Units Of Hood And Ductwork Systems For New Absorber

Two Identical Units Of Hood And Ductwork Systems For New Absorber

   Case Study           1  11739 M68/33      Onaway, MI 49765      moraniron.com      989-733-2011       HOOD AND DUCTWORK  Two identical units of hood and duct work systems for new absorber  This project includes two nearly identical  units consisting of hood and duct work  systems for a new absorber at an Electric  Power Generating Plant in Michigan.  Materials of construction were primarily  ASTM 2205, a high nickel duplex stainless  steel all

Join for free to read