Case Study

Tween Bridge Wind Farm, Doncaster

Tween Bridge Wind Farm, Doncaster

Pages 2 Pages

Project review Tween Bridge Wind Farm, Doncaster SPECIAL PROJECTSTween Bridge Wind Farm consists of 22 turbines that, per annum, generate up to 44MW of power, providing 300, 000 homes with their annual electricity needs. The towers and concrete foundations are constantly exposed to the force of strong winds; this constant movement stresses the structure and can encourage cracks in the tower and foundations, which then become vulnerable to m

Join for free to read