TUR centralizers pulled through a FMC sub-mudline receptacle with no issues

TUR centralizers pulled through a FMC sub-mudline receptacle with no issues

Pages 1 Pages

Centek Centralizer | TUR centralizers pulled through a FMC sub-mudline receptacle with no issues In this Deepwater well in Malaysia, TUR centralizers are pulled through a FMC sub-mudline receptacle with a 17.183" restriction with no issues. THE CHALLENGE A vertical (2 degree) well with a depth of 1,110 in Malaysia. A FMC sub-mudline receptacle with a restriction of 17.183” was in the 20” casing at ~920m. THE SOLUTION The customer ran 600m of 16” liner with 1 Centek TUR 16" x 20" centralizer per 4 joints in open hole (based on inclinations <1deg). Aside from the initial push required to get the shoe centralizer into the wellhead, no issues were observed running the centralizers through the wellhead and the SML hanger restriction. Unfortunately a problem was encountered when landing the SM