Case Study

Tunnel Fill

Tunnel Fill

Pages 1 Pages

• Value Engineering replacement for foamed concrete as lightweight fill • Redevelopment of existing industrial building required backfilling existing tunnels under slab • Foundation soils consisted of soft compressible material • Contractor was able to install UL-FGA without enlisting a specialty subcontractor • Self-performance allowed contractor to meet project schedule • Once tunnels wer e filled with UL-FGA and compacted, a new concr ete slab was constructed over the UL-FGA-filled tunnels and adjacent areas The information contained herein is believed to be accurate and reliable. AeroAggregates, LLC accepts no responsibility for the results obtained through application of this product. AeroAggregates reserves the right to update information without n

Join for free to read