Case Study
Tunnel Boring Machine
OMEGA MORGAN.COM PORTLAND (503) 647-7474 INDUSTRY: Heavy Civil PROJECT TYPE: Specialized Heavy Rigging &Transportation PROJECT OVERVIEW: Transported (3) TBM components from Husky Stadium to JCM Northlink’s tunnel access site in downtown Seattle. All (3) hauls were made in (2) nights with limited hours using Omega Morgan’s dual lane trailer. The trailer was equipped with modified low-profile rails to ensure clearance under the low trolley lines and pedestrian bridges. -Frontbody: 21’6”D x 11'2”T - 212,000lbs -Middlebody: 24’4”D x 13’1”T - 248,000lbs -Rearbody: 21’4”D x 13’1”T - 112,000lbs EQUIPMENT USED: Dual lane trailer with low- profile rails PROJECT: TUNNEL BORING MACHINE CALGARY (855) 588-3230 SEATTLE (253) 825-7500