Case Study
Troll A, Power from shore
This second delivery to Statoil, Troll A 3&4, will provide a total of 100 MW to the platform to power two compressor drive systems. It is scheduled to be operational in 2015. In 2002, ABB was awarded the world’s first offshore transmis- sions using HVDC Light technology to the same platform - Troll A 1&2, which was successfully completed in 2005. The proj- ects combine HVDC Light technology and the ABB very high voltage (VHV) cable-wound mot