Case Study

Troll A, Power from shore

Troll A, Power from shore

Pages 1 Pages

This second delivery to Statoil, Troll A 3&4, will provide a total of 100 MW to the platform to power two compressor drive systems. It is scheduled to be operational in 2015. In 2002, ABB was awarded the world’s first offshore transmis- sions using HVDC Light technology to the same platform - Troll A 1&2, which was successfully completed in 2005. The proj- ects combine HVDC Light technology and the ABB very high voltage (VHV) cable-wound mot

Join for free to read