TRINITY PRODUCTS, LLC TRINITYPRODUCTS.COM 800.456.7473 TRI-LOC CASE STUDY Trinity Products’ Weldless Interlock System PROJECT: Lake Davis – City of Orlando LOCATION: Orlando, FL OWNER: City of Orlando CONTRACTOR: Downtown Underground of Central Florida SOIL CONDITIONS: Mix of Sand and Gummy Greenish Clay SCOPE: Install 110 linear feet of 36" OD x .500" steel casing pipe near Lake Davis in central Orlando, Florida in a clay and sand mix of soil. RESULTS: The contractor was able to finish the project on time and with minimal issues. Even with the soil conditions being clay and sand, there were no issues with the spiral weld pipe. However, this project proved that the 4-Tooth design was too tight and the 3- tooth design needed to be adopted for auger boring. TES