The full protection package included 20,000 m 2 PROMATECT ® -250 for structural steel columns, and 40,000 m2 Promat TD Board ® for steel beams. Fire stopping requirements were addressed using various products from the Promat PROMASEAL ® range, while SUPALUX ® was specied for windpost protection and VERMICULUX ® for various concrete so ts. The combination of product quality and re tested interface details, enabled Promat to play a key role in the products being chosen for Trinity Leeds. Together with the expertise previously gained through working on similar large-scale retail projects, they helped ensure that we could provide the most robust and eective solutions possible for this project. One of the key concerns on a project such as this is the need to ensure reliable protection