Case Study

Trimont Condominiums

Trimont Condominiums

Pages 1 Pages

PROJECT PROFILE WJE www.wje.com Trimont Condominiums Facade Condition Assessment | Pittsburgh, PA CLIENT Trimont Condominiums BACKGROUND Originally constructed in the early 1980s, Trimont Condominiums is a multi-building condominium complex that is constructed of a cast-in-place reinforced concrete structural framing system. The concrete frame is exposed on the exterior and aluminum ribbon windows are installed between the concrete spandrel members. Various repairs had been completed on the facade during prior repair efforts by others. The repairs were generally related to water intrusion into the building and visible concrete distress. SOLUTION Six concrete c

Join for free to read