Case Study

Transportation of Ore Slurry in Rusal facility

Transportation of Ore Slurry in Rusal facility

Pages 2 Pages

The main challenges were corrosion and scaling formation on the inner surface of existing steel pipes, causing a decrease of inner diameter and consequent decrease of their throughput. - Solution was replacement of the existing 159 mm steel pipe with a 160 mm class 15 (SDR 11) Pexgol pipe.

Join for free to read