Case Study

Transportation Of Nine Modules Using The Lo-Lo Methodin The Port Of Tarragona For The Optara Project

Transportation Of Nine Modules Using The Lo-Lo Methodin The Port Of Tarragona For The Optara Project

Pages 1 Pages

Project: Transportation of nine modules using the lo-lo method in the Port of Tarragona Location: Tarragona, Spain Equipment: 40 lines of SPMT Weight: 22t a 360t ALE537SP ALE Heavylift Iberica S.A Polígono Los Frailes P 101-106 (28814 Daganzo de Arriba) - Madrid - Spain. Transportation of nine modules using the lo-lo method in the Port of Tarragona for the Optara project As part of the Optara project,

Join for free to read