Case Study

Transocean Arctic Drilling Rig Tank Cleaning Hanøytangen

Transocean Arctic Drilling Rig Tank Cleaning Hanøytangen

Pages 2 Pages

Transocean Arctic Drilling Rig Tank Cleaning Hanøytangen Case Study: Transocean Arctic Drilling Rig Location: Hanøytangen Yard, Bergen, Norway Operator: Transocean AS During a scheduled shipyard visit we were contracted to remove all Oil Based Mud waste from the double bottom areas onboard to allow inspection. Sureclean Scope Primary scope of work was to provide the necessary manpower and equipment for the removal of all Oil Based Mud waste from the double bottom areas onboard the rig, to allow inspection and remedial repairs to be carried out. The total area requiring to be cleaned was estimated at over 2,500 bays, with each bay approximately 1 metre x 3 metre x 1 metre. Technical Challenge Restrictions/Considerations Key Achievments Additional Information Sureclean’s ethos of having and

Join for free to read