Case Study

Transit System Tunnel Work Benefits From Gradall Excavator's Boom Rotation

Transit System Tunnel Work Benefits From Gradall Excavator's Boom Rotation

pro?le 92 Excavating and building twin tunnels to extend the Sound Transit in Seattle, Washington, is an extensive process requiring durable, versatile equipment that can work productively on the challenging job. Each of the twin tunnels created for the University Link Extension are 3.15 miles long and 26 feet in diameter, ultimately joining downtown Seattle with the University of Washington to its north. v Contractor for the project was Tray

Join for free to read