Case Study
Transforming A Textile Production Line
Case Study Transforming a textile production line Background This site is part of a larger textile group. CQM worked alongside the operations team on a high volume bonded textile manufacturing line. Scrap tiles per week reduced by 48% through the implementation phase of the project, leading to measured savings of £192,000 per annum. There was no capital expenditure incurred. ? High level of scrap output from the line which