Case Study

Transcoil rigless-deployed ESP system gets stranded production back on line, reduces installation time by more than 50%

Transcoil rigless-deployed ESP system gets stranded production back on line, reduces installation time by more than 50%

Pages 1 Pages

T ranscoil rigless-deployed ESP system gets stranded production back on line, reduces installation time by more than 50% Results • Reduced ESP installation time by 50% • Reduced workover costs by more than 50% • Got well producing 8,000 BOPD back on production after 1 year of down time Challenges • Ecessive down time due to rig availability to pull and install ESP systems • High rig-based intervention costs BHGE solution • TransCoil rigless deployed ESP system, marking the first installation of its kind • Innovative cable and inverted ESP design • BHGE coiled tubing services • BHGE seal assembly and polished bore receptacle An operator in the Middle East was experiencing long lead times to get a rig on location to retrieve and install electrical submersible pu

Join for free to read