For information on FlatMesh – our award-winning wireless asset condition monitoring solution, call: 0207 731 8269 email: gsmith@senceive.com visit: senceive.com ©2015 Senceive Ltd. Hurlingham Studios, Ranelagh Gardens, London SW6 3PA CASE STUDY Trackbed Monitoring: Camley Street CLIENT: TAYLOR WIMPEY THE CHALLENGE Bridgeway Consulting was commissioned to undertake a track monitoring project at Camley Street nr.St. Pancras Station to monitor track deflection during demolition and construction adjacent to open lines. The site was approximately 150m long, with four NR lines close to site (2 sidings and the Up & Down fasts) where settlement, heave, twist and cant were to be monitored at 3m intervals. Monitoring was planned to be undertaken 24/7, for an initial period of 26 weeks,