Case Study
Top marks to Bethany school!
Located in the stunning Kent Weald countryside, Bethany is a co- educational school for pupils aged 11 to 18. The school serves to increase the great divide between the fee paying and public sector, where sadly more and more pools are closing due to financial exigency. The school’s brief to the main contractor, Fowler Swimming Pools, was to replace an old 1930s outdoor pool and build a high quality, indoor 25m x 11.6m deck level, fully tiled pool with depths of 1m to 1.8m. Fowler and Norwegian Log Buildings designed the complex and were able to achieve planning permission in an Area of Outstanding Natural Beauty. Fowler identified and specified the pool’s key ingredients to meet the school’s exacting energy saving requirements. One of the systems used was the Calorex Delta 1