TOO Bogatyr Access Komir, Ekibastus Slope Conveyor Bridge

TOO Bogatyr Access Komir, Ekibastus Slope Conveyor Bridge

Pages 2 Pages

Slope Conveyor Bridge SFB-R (K) 1800.25 Customer Plant Location Scope of work TOO Bogatyr Access Komir, Ekibastus Open Cast Mine Bogatyr (Kazakhstan) Turn-key project 1 Project Figures Conveying capacity: 5,500 m³/h Max. bulk conveying: 6,300 t/h Height: approx. 16 m Length: approx. 153 m Width: approx. 16 m Distance between supports: 110.65 m ± 4.5 m Outreach of discharge side: 18 m Length of receiving side: 24 m Drive speed: 6 m