Case Study
Toll Group
T oll Group Mackay, Bundaberg, Gladstone INDUSTRIAL SECTOR NuGreen Solutions were engaged to provide complete LED retro fit solutions for three of Toll NQX’s Northern QLD depots ; Mackay, Gladstone and Bundaberg. The rollout would entail redesign of the current Warehouse lighting where inefficient 400 Watt Metal Halide lighting would be replaced by a range of LED Highbays between 90 and 165Watts. In all instances NuGreen were able to optimise the design so that not only did the wattage reduce but overall numbers of fittings were reduced to further improve the energy savings. The design review also Photo Electric (PE) cells which were installed to control all the lights based on the available ambient light, which would ensure that the lights are off when the lux levels are suffi