Case Study
Toledo Public Schools Scott High School
JDRM The project was designed under the O.S.F.C. Standards with minimum LEED silver certification. JDRM Engineering provided complete mechanical, electrical, technology, and plumbing system designs. Toledo Public Schools Scott High School The campus renovations included a 1900 High School Building (177,350 sf); a 1952 Field House Building (43,500 sf); a 1976 Skill Center Building, (45,700 sf); and a 10,800 sf Cafeteria added in 1999.Mechanical system design: heating, ventilating and air conditioning system consisting of several indoor ventilation units; indoor variable refrigerant flow heat pump units with associated indoor water cooled condensing units; an outdoor cooling tower and hot water heating boilers to keep the water to the indoor condensing units within the proper operating ran