Case Study
Titan provides a higher level of support, with far less components for sky bridge supports in Qatar
Case Study Titan provides a higher level of support, with far less components for sky bridge supports in Qatar “...with limited use of the site crane, only ten men were needed to erect the structure in three working days...”Project: Hermas offices and apartments Location: Lusail, Doha, Qatar Customer: Al Kamal International Group Product: Titan Support Due for completion: 2019 The challenge Four separate 10-storey blocks, rising from a common ground floor area above basement car parking, required to be joined at two locations at the ninth and tenth floor levels with concrete slab sky bridges. The challenge was to support the two bridging slabs, initially for casting the ninth floor bridge and later on as a back prop to restrain the loads from the tenth floor above. Each bridge s