Case Study

Timely Retrofit Keeps Casino Comfortable

Timely Retrofit Keeps Casino Comfortable

Product Report M176 Baltimore Aircoil Company Pat Lester, Senior Engineer at the Palace Station Hotel and Casino in Las Vegas, Nevada, had a problem. In the summer of 1999, the facility’s climate conditioning system was constantly being pushed to its limits in order to maintain the cooling performance required for the building. On particularly hot days, Pat was forced to drain the water from the cooling tower basin and replace it with cold city

Join for free to read