Case Study

Timber Manufacturer

Timber Manufacturer

Pages 2 Pages

High Voltage Case study Power supply network upgrade at Sawmill Introduction SDC Industries were approached by a large timber manufacturer in September of 2015. They required a replacement of their power supply network, including a new 1000KVA transformer, switchboards and cabling. Solution The first step was for SDC Industries to visit the client’s facility to gain a better understanding of the client’s requirements. After undertaking

Join for free to read