Case Study

Tilden Road Improvements

Tilden Road Improvements

Owner: Town of Brownsburg Engineer: GRW Contractor: Brackney Technical Description: l Vortechs ® hydrodynamic separator l A-Jacks ® articulated concrete block l ArmorFlex ® hard armor revetment Installation: September 2015 The Town of Brownsburg, IN needed to perform improvements to the heavily traveled Tilden Road. This included widening the pavement, installing sidewalks, and improving the existing st

Join for free to read