Tideway selects Advanced to support London’s £4.2bn ‘super sewer’

Tideway selects Advanced to support London’s £4.2bn ‘super sewer’

CASE STUDY Our managed service contract with Advanced will provide support to the 2016 Thames Tideway Tunnel. Tideway selects Advanced to support London’s £4.2bn ‘super sewer’ Background It was recognised that London’s Victorian made sewerage system was no longer fit for purpose. To tackle the problem of overflows and protect the tidal River Thames from pollution, we decided to undergo the largest infrastructure project by the UK water industry, We at Tideway are a licensed Infrastructure Provider constructed to finance, build, maintain and operate the Thames Tideway Tunnel. The £4.2 billion 'super sewer' stretches 25-kilometer with the aim of preventing around 39 million tonnes of untreated sewage being released into the tidal River Thames every year. With a diameter of 7.