Three-shaft, Pre-and Inter-cooled Recuperative Brayton Cycle

Three-shaft, Pre-and Inter-cooled Recuperative Brayton Cycle

THREE-SHAFT, PRE- AND INTER-COOLED RECUPERATIVE BRAYTON CYCLE The PBMM (the world’s first closed cycle multi–shaft gas turbine test rig) was developed to demonstrate the operation of a three-shaft, pre- and inter-cooled recuperative Brayton cycle in order to gain a better understanding of its dynamic behavior. The entire cycle was designed, simulated and commissioned with Flownex within 9 months at a cost saving of $48 million. T