Pages 2 Pages

Three of the most successful shipbuilders choose Synectics for KOGAS LNG project The remaining camera stations that complete the CCTV system specified for the KOGAS project include the established, and industry-proven, COEX Ex-d certified camera stations. One of the five vessels is the first LU2 ice-class LNGC ever to be undertaken by DSME. It is well known that the construction of an ice-class LNGC requires greater engineering skills, because the steel and equipment installed on the vessel must withstand cold conditions. In particular, the machinery and equipment installed on the exposed weather deck should be able to operate in an air temperature of -25°C. Furthermore the vessel can sail on water covered with 0.6m of ice. A high-quality solution for challenging condit