Case Study

Three new coal fired power stations in Brazil use New Chimney Design to minimize chimney construction cost and maximize long term reliability.

Three new coal fired power stations in Brazil use New Chimney Design to minimize chimney construction cost and maximize long term reliability.

Pages 4 Pages

Pecém & Itaqui Power Stations Key facts Pecém I: 2 x 360 MW power station Pecém II: 1 x 360 MW power station Itaqui: 1 x 360 MW power station Semi-dry FGD for SO 2 reduction Flue gas temperature 153 °F Four Pennguard ® lined concrete chimneys (New Chimney Design) Pennguard ® is a registered trademark of Ergon Asphalt & Emulsions, Inc. PENNGUARD ® Block Lining System Project Report Protecting Power Plant chimn

Join for free to read