Case Study

Three 500 Kw Generator Sets Assure Water Supply In “Tornado Alley” Digital Controllers Eliminate Need For Traditional Switchgear

Three 500 Kw Generator Sets Assure Water Supply In “Tornado Alley” Digital Controllers Eliminate Need For Traditional Switchgear

STANDBY POWER ThREE 500 kW gENERATOR SETS ASSuRE WATER SuPPl Y iN “TORNADO AllEY” DigiTAl c ONTROllERS ElimiNATE NEED f OR TRADiTiONAl SWiT chgEAR Washington County Rural Water District #3 is more than keeping pace with the increasing population of greater Tulsa. The district’s water treatment plant — expanded from a capacity of 4 million gallons a day to 12 million gallons a day — is now designed to serve the area’s current popula